Sheet 14Domain 2 of 5 · Hazard Identification and Control

Electrical safety, lockout and hot work for the STSC

A cord pinched under a door, a panel cover leaning against the wall, a cylinder cart parked in the stairwell: you make each of these calls on a walk, often in under a minute. Electrical safety on a construction site means temporary power, cords and lockout, and this STSC sheet adds hot work because welding and cutting bring electrical and fire hazards to the same corner.

Temporary power and the lock

Construction electrical rules sit in 29 CFR 1926 Subpart K (1926.400 to 1926.449). They are short on theory and long on site equipment: temporary wiring, flexible cords, ground-fault protection for the receptacles workers plug tools into, and clearances from overhead lines. The ground-fault rule for temporary power, 29 CFR 1926.404(b)(1), deserves a slow read.

Lockout/tagout (LOTO) is the other half. The construction rule for de-energized circuits is 29 CFR 1926.417, and concrete and masonry equipment gets its own lockout line in 1926.702(j). The step-by-step energy-control procedure in most safety training comes from the general-industry standard, 29 CFR 1910.147.

Hot work and welding are in Subpart J (1926.350 to 1926.354). Hot work: combustibles first, then the fire watch takes the fire side in order; the cylinder rules are further down this sheet.

Energy to find before anyone reaches in

  • Electrical supply at the disconnect
  • Stored electrical energy in capacitors and batteries
  • Hydraulic pressure trapped in lines and cylinders
  • Compressed air in receivers and hoses
  • Gravity: raised booms, buckets, forms and counterweights
  • Springs and other stored mechanical tension
  • Heat and chemical energy in lines, kettles and tanks

GFCI and circuit breaker do different jobs

What each device watches for
PointGround-fault circuit interrupter (GFCI)Circuit breaker
Watches forCurrent leaking to ground, such as through a personToo much current in the circuit
ProtectsThe worker holding the toolWiring and equipment from overheating
Trips on a shock through a handYes, fast enough to limit the shockUsually not; the current is too small to register
Where the device sitsBuilt into a receptacle, a cord set or a breakerIn the panelboard

A tripped GFCI is a signal to find the fault. Bypassing it with a cord or outlet that lacks one removes the only protection the worker had.

Lockout and live-power drill

Panels, cords, lockout on pumps and mixers, power lines, welding near combustibles and empty drums.

Card 1 of 16 · 0 right

Card 1

A mechanic will reach into a concrete conveyor to clear a jam. The operator has pressed the stop button. What should the supervisor require BEFORE the mechanic reaches in?

Pick an answer. A short note for each option, A to D, appears here.

Card 2

An audit found several temporary power panels without working GFCI protection. The electrical foreman later reports the items 'fixed.' What is the BEST way for the supervisor to verify the corrective action?

Pick an answer. A short note for each option, A to D, appears here.

Card 3

A written lockout procedure exists for a concrete pump, but the supervisor suspects crews take shortcuts. Which method BEST shows whether the procedure is followed in practice?

Pick an answer. A short note for each option, A to D, appears here.

Card 4

During an inspection, a supervisor finds an extension cord run through a hole in a wall to power a site office's lights for the last three months. What is the BEST corrective action?

Pick an answer. A short note for each option, A to D, appears here.

Card 5

Electricians will work on a circuit that can be energized from both the main panel and a portable generator transfer switch. What does OSHA require before the work begins?

Pick an answer. A short note for each option, A to D, appears here.

Card 6

A welder is joining steel next to wood blocking that cannot be moved, and the supervisor has posted a fire watch. Under 29 CFR 1926.352, how long must the fire watch continue after welding stops?

Pick an answer. A short note for each option, A to D, appears here.

Card 7

An electrician is assigned to retighten terminations inside a 480-volt panel that feeds the site trailer. The work does not require the panel to be energized. What is the BEST control?

Pick an answer. A short note for each option, A to D, appears here.

Card 8

A mortar mixer has been shut down, and its disconnect has been locked and tagged so a laborer can clear the drum. What should be done next, before the laborer reaches into the drum?

Pick an answer. A short note for each option, A to D, appears here.

Card 9

Two subcontractors will service the same air-handling unit on the same day. One uses individual personal locks; the other uses a single crew lock. What is the BEST approach?

Pick an answer. A short note for each option, A to D, appears here.

Card 10

A supervisor finds a temporary lighting circuit with damaged insulation and exposed conductors along a corridor where several trades work. What is the MOST effective control?

Pick an answer. A short note for each option, A to D, appears here.

Card 11

A contractor supplies temporary power to hand tools from 120-volt, single-phase, 15- and 20-ampere receptacles that are not part of the building's permanent wiring. What ground-fault protection does OSHA require?

Pick an answer. A short note for each option, A to D, appears here.

Card 12

What is the primary hazard control when welding must be performed near flammable materials that cannot be relocated?

Pick an answer. A short note for each option, A to D, appears here.

Card 13

Masons plan to erect a supported scaffold along a wall where an uninsulated 13.8 kV distribution line runs parallel to the building. The utility will not de-energize or move it. What minimum distance must the scaffold and the conductive materials handled on it keep from the line?

Pick an answer. A short note for each option, A to D, appears here.

Card 14

A mobile crane will be set up on a tight lot next to a street with overhead distribution lines of unknown voltage. What does OSHA require BEFORE the crane is assembled?

Pick an answer. A short note for each option, A to D, appears here.

Card 15

A worker wants to cut the top off an empty 55-gallon drum that held a solvent, to use it as a trash barrel. What should the supervisor require before any cutting torch is used?

Pick an answer. A short note for each option, A to D, appears here.

Card 16

A welder working under a hot work permit on the second floor finishes early and wants to continue the same type of welding on the fourth floor. What should the supervisor require before work resumes?

Pick an answer. A short note for each option, A to D, appears here.

    Cylinders, hoses and the welding area

    Oxygen and fuel-gas cylinders turn hot work into a storage question. Under 29 CFR 1926.350(a), cylinders are secured upright, and stored oxygen sits at least 20 feet from fuel-gas cylinders or behind a noncombustible barrier at least 5 feet high with a fire-resistance rating of at least half an hour.

    Hoses and torches in use get inspected at the start of each shift, and defective ones come out of service (29 CFR 1926.350(f) and (g)). Suitable fire extinguishing equipment has to be immediately available in the work area and kept ready (1926.352(d)).

    Rules this sheet cites

    Next sheets

    Keep the set in your pocket

    Pick up where you left off on iPhone or iPad when you have five minutes.