Sheet 13Domain 2 of 5 · Hazard Identification and Control

Trenches and permit spaces: STSC excavation and confined-space rules

The excavator is down to shoulder height on a sewer lateral and the trench box is still on the lowboy. At 5 feet deep a trench needs a protective system, unless it is dug entirely in stable rock, and a competent person has to inspect it every day. The rest of this sheet covers soil, water, utilities and the way out, plus the confined spaces that have their own construction subpart.

Subpart P, then Subpart AA

Excavation sits in 29 CFR 1926 Subpart P (1926.650 to 1926.652). Two of its numbers sit a foot apart: 4 feet for a way out of the trench, 5 feet for a protective system. Keep them in their rows.

The competent person is the hinge of the subpart. Under Appendix A to Subpart P that person classifies the soil as stable rock, Type A, B or C, and the class decides which sloping or shoring options are allowed. Competent person vs qualified person explains where that person's authority ends and engineered design begins.

Confined spaces in construction have their own subpart too, 29 CFR 1926 Subpart AA (1926.1200 to 1926.1213), written for sites where several employers share one space. Test order and who signs the permit are on confined space entry and atmospheric testing.

Trench numbers by depth

Excavation thresholds in 29 CFR 1926 Subpart P
Depth or distanceWhat it triggersRule
Any depthUtility locations estimated before digging; daily inspection by a competent person1926.651(b)(1), 1926.651(k)(1)
4 ft deepStairway, ladder, ramp or other safe exit within 25 ft of lateral travel1926.651(c)(2)
5 ft deepProtective system: sloping, benching, shoring or shielding, unless the cut is entirely in stable rock1926.652(a)(1)
2 ft back from the edgeSpoil and materials kept at least this far away, or held back by retaining devices, so they cannot fall or roll in1926.651(j)(2)
Over 20 ft deepProtective system designed by a registered professional engineer1926.652(b) and (c)

Checked against eCFR on Oct 12, 2026.

Confined space terms with construction meanings

Confined space
Large enough to enter and work in, with limited ways in or out, and not designed for continuous occupancy (29 CFR 1926.1202). Manholes, vaults, tanks, crawl spaces and pits all fit.
Permit-required confined space
A confined space with one or more of these: a hazardous atmosphere or the potential for one, material that can engulf an entrant, a shape that can trap or asphyxiate, or any other serious hazard.
Entry
Any part of the body passing through the opening. Leaning in to read a gauge counts.
Controlling contractor
The employer with overall responsibility for the site. Under 29 CFR 1926.1203(h) it passes what it knows about a space to each entry employer and coordinates entries when more than one employer works in or around the space.
Entry employer
Any employer whose own workers enter the space. It runs the permit program for its crew.

Test yourself on trenches and tanks

Most of these cards put you at the edge of a trench that is already open; the rest go down a vault, into a tank or past a leaking drum.

Card 1 of 15 · 0 right

Card 1

Before a permit-space entry into a 12-ft-deep vertical vault, which rescue arrangement BEST meets OSHA's construction confined space standard?

Pick an answer. A short note for each option, A to D, appears here.

Card 2

Workers are laying pipe in an 8-foot-deep trench with vertical walls and no protective system. The project manager insists the tie-in must be finished today. What should the supervisor do FIRST?

Pick an answer. A short note for each option, A to D, appears here.

Card 3

After heavy overnight rain, water has collected in the bottom of a 7-foot-deep trench protected by a trench box. The crew wants to start work. What should the supervisor do FIRST?

Pick an answer. A short note for each option, A to D, appears here.

Card 4

A crane operator spots a drum leaking an unknown liquid in the laydown yard. The operator is trained only to the HAZWOPER first responder awareness level. What should the operator do?

Pick an answer. A short note for each option, A to D, appears here.

Card 5

Utility paint marks show a gas line crossing the planned path of a trench. As the excavator nears the marks, what should the supervisor require?

Pick an answer. A short note for each option, A to D, appears here.

Card 6

During a permit-required confined space entry, the attendant sees an entrant collapse inside the space. What should the attendant do?

Pick an answer. A short note for each option, A to D, appears here.

Card 7

A trench being dug next to an old landfill could develop a hazardous atmosphere. What emergency equipment must be readily available under 29 CFR 1926.651?

Pick an answer. A short note for each option, A to D, appears here.

Card 8

While digging a trench, a crew exposes an old cast-iron water main that now spans the open trench unsupported. What should the supervisor require?

Pick an answer. A short note for each option, A to D, appears here.

Card 9

A supervisor inspects a 6-ft trench next to a leaking fuel line by looking from the surface only. Which hazard is this approach MOST likely to miss?

Pick an answer. A short note for each option, A to D, appears here.

Card 10

A competent person measures an unconfined compressive strength of 1.6 tsf in a cohesive soil, but the new trench runs alongside an old backfilled utility trench. How should the soil be classified?

Pick an answer. A short note for each option, A to D, appears here.

Card 11

A competent person classifies the soil for a 10-foot-deep trench as Type C. The crew will slope the walls instead of using shoring or a trench box. What is the maximum allowable slope?

Pick an answer. A short note for each option, A to D, appears here.

Card 12

Laborers have been crossing an open 8-foot-deep trench on two loose planks to reach a material pile on the far side. What does OSHA require for this crossing?

Pick an answer. A short note for each option, A to D, appears here.

Card 13

During the morning inspection of a 7-ft-deep trench, which observation is a warning sign of a possible cave-in?

Pick an answer. A short note for each option, A to D, appears here.

Card 14

Before workers enter a permit-required confined space on a construction site, who must sign the entry permit to authorize entry?

Pick an answer. A short note for each option, A to D, appears here.

Card 15

During a site walk, a supervisor sees that a haul road beside an open 8-ft trench has been narrowed by a new spoil pile, pushing trucks toward the edge. Which hazard should be addressed FIRST?

Pick an answer. A short note for each option, A to D, appears here.

    Shallow cuts, soil calls and confined-space scope

    Can a trench shallower than 5 feet still need protection?

    Yes. Under 29 CFR 1926.652(a)(1), a cut under 5 feet goes without a protective system only when a competent person examines the ground and finds no sign of a possible cave-in.

    Who classifies the soil, and how?

    The competent person, using at least one visual and at least one manual test under Appendix A to Subpart P. Without a classification, sloping has to follow the most conservative option, the one written for Type C soil (29 CFR 1926.652(b)(1)).

    Is a trench a confined space under Subpart AA?

    No. 29 CFR 1926.1201(b) leaves excavation work covered by Subpart P out of the confined space subpart, and the trench rules handle their own atmosphere hazards.

    Next sheets

    Drill this topic between pours

    The app keeps the set going on your phone, a few cards at a time.