Sheet 20Domain 4 of 5 · Emergency Preparedness and Management

When the alarm sounds: STSC emergency action plans and drills

Under 29 CFR 1926.35, a construction emergency action plan has to tell workers how to get out, who shuts down what before leaving, how everyone is counted afterward and how an emergency gets reported, and its alarm must meet 29 CFR 1926.159. The cards on this sheet take that plan into buildings under construction, on day shift and night shift.

Incident Command System terms

Incident Command System (ICS)
The standard U.S. structure for managing an emergency response. Fire departments and other responders use it so several agencies can work under common terms and roles.
Incident Commander
The person in overall charge of the response, responsible for its objectives and for everyone working on it.
General Staff
The four sections that report to the commander: Operations, Planning, Logistics, and Finance/Administration.
Span of control
How many people one person can supervise well during a response: three to seven, with five as the usual target.
Unified command
Two or more agencies with jurisdiction share the command role and work to one set of objectives.

Alarm, route and drill questions

Many of these start on a walk-through or in a drill debrief.

Card 1 of 17 · 0 right

Card 1

A superintendent runs the first evacuation drill on a mid-rise project now that the temporary stair towers are in use. Which outcome BEST shows the drill achieved its PRIMARY purpose?

Pick an answer. A short note for each option, A to D, appears here.

Card 2

When the fire department arrives at a jobsite fire, what is the site supervisor's role under the Incident Command System?

Pick an answer. A short note for each option, A to D, appears here.

Card 3

When is the BEST time to schedule an additional evacuation drill on a building project that already held one at mobilization?

Pick an answer. A short note for each option, A to D, appears here.

Card 4

On a multi-employer site, two subcontractor foremen give conflicting evacuation orders during an emergency. Which plan element would MOST likely have prevented this?

Pick an answer. A short note for each option, A to D, appears here.

Card 5

During an evening walk-through of a building under renovation, a supervisor finds the only stair door on the third floor chained shut to prevent theft while drywall crews are still working. What should the supervisor do?

Pick an answer. A short note for each option, A to D, appears here.

Card 6

A supervisor is choosing an assembly area for a site with a high-pressure gas line along the north fence and a prevailing wind from the west. Which location is BEST?

Pick an answer. A short note for each option, A to D, appears here.

Card 7

On a large site with pile driving and jackhammering, several workers wearing earplugs did not hear the evacuation horn during a drill. What is the BEST correction?

Pick an answer. A short note for each option, A to D, appears here.

Card 8

Where should evacuation maps be posted on a multi-story building under construction?

Pick an answer. A short note for each option, A to D, appears here.

Card 9

A crew will excavate near buried natural gas mains. Which contact is MOST important to add to the site's emergency contact list?

Pick an answer. A short note for each option, A to D, appears here.

Card 10

Before work begins on a large site with several gates and a partially built parking structure, what is the MOST useful step to coordinate with the local fire department?

Pick an answer. A short note for each option, A to D, appears here.

Card 11

Two-way radios are the primary emergency alert on a large site. Which is the BEST backup if the radio system fails?

Pick an answer. A short note for each option, A to D, appears here.

Card 12

A site's evacuation horn and strobes run off the temporary power panel. Which change BEST ensures the alarm will work during an emergency?

Pick an answer. A short note for each option, A to D, appears here.

Card 13

How can a supervisor BEST confirm that the posted evacuation routes on a multi-story project are still usable?

Pick an answer. A short note for each option, A to D, appears here.

Card 14

An evacuation drill combines a fire alarm with a simulated injured worker blocking the stair tower that crews normally use. What is this drill MOST likely designed to test?

Pick an answer. A short note for each option, A to D, appears here.

Card 15

A drill debrief finds that most night-shift workers did not know where the assembly area was. What is the BEST corrective action?

Pick an answer. A short note for each option, A to D, appears here.

Card 16

Under 29 CFR 1926.35, what must the employer do before implementing an emergency action plan?

Pick an answer. A short note for each option, A to D, appears here.

Card 17

During a fire evacuation of a building under construction, a worker with a sprained ankle cannot descend the stairs quickly. What is the BEST action under the site's plan?

Pick an answer. A short note for each option, A to D, appears here.

    From the page to the building

    Each element of the rule, read line by line, is on the emergency action plan requirements sheet. On site, each line turns into a name, a place or a sound.

    Critical operations are the ones a crew cannot simply drop: a crane with a load in the air, a running concrete pump, a hot tar kettle. The plan names who makes each of those safe before leaving, and that person still needs a way out.

    Not every spill is an emergency under HAZWOPER, the hazardous waste and emergency response rule; the requirements sheet shows where that line falls.

    Fire and medical emergencies have sheets of their own, fire prevention and extinguishers and first aid, rescue and severe weather, and the practice test covers everything at once.

    Drills and the domain

    Does 29 CFR 1926.35 set a schedule for evacuation drills?

    No. The rule says what the plan must contain and requires it to be reviewed with the workers it covers, but it names no drill frequency. How often a site drills is the employer's call.

    Which STSC domain covers emergency planning?

    Domain 4, Emergency Preparedness and Management, which BCSP weights at 16.6% of the exam (STSC7 blueprint, as of October 2026). Plans, alarms and drills share it with fire prevention, first aid, rescue and weather.